Keep the liquid filling machine cleaning and maintenance methods: Keep liquid filling machine pipeline cleaning, all piping and PET bottle Mold indirect or direct contact with the pipe material, in particular, should keep clean, once a week to scrub, water every day, every time sterilization; Ensure that filling machine is clean, the material groove to scrub and sterilization, ensure that all parts in contact with materials not fouling and mixed bacteria. The production process to ensure the biological stability of bottled drinks sterilization is the best way, must control the sterilization time and temperature, to ensure that the final effect, to avoid the sterilization time is too long or the temperature is too high, reduce drink oxidation, as soon as possible after the sterilization to cooling temperature is not more than 35 ℃.
Low temperature filling is to drink filling minimum requirements, usually drink product in low temperature environment is not easy to bubble, is advantageous to the filling. In filling machine, before every work with 0 ~ 1 ℃ water filling machine tank and pipeline temperature is reduced, when filling temperature of 4 ℃ should be after lowering the temperature in the filling operation. Using heat preservation tank, constant temperature filling, filling materials in the provisions of the time to keep a constant temperature, lest cause filling machine working instability due to temperature change is too large. In addition, the best filling equipment and other equipment, filling machine lubrication parts and filling material should prevent cross contamination, conveyor lubrication with special soap and water or oil.
Processes of liquid filling machine is commonly: plastic bottle making machine boxes piled up with empty bottle on the tray, the conveyor belt to unload tray machine, remove the tray one by one, the box with the conveyor belt to discharge machine, remove empty bottles from the box, empty the conveyor belt to the washing machine, the clean, and then transported to packing machine, so that the beverage containing bottles into one. Empty bottles, taken from the discharge machine, by another conveyor belt into the bottle washing machine disinfection and cleaning, the bottle inspection machine, after cleaning standards into the filling machine and sealing machine. Drink by filling machine into the bottle. Good drink bottles, the capping machine affix a seal to labeling machine labeling, labeled after sent to packing machine into the box and then sent to the stack tray stacked on the pallet into the warehouse.
Beverage filling machine is facing a corresponding change. The PET blow moulding machine bottle is convenient, light, environmental protection, loved by consumers, the characteristics of cap like ordinary plastic bottle caps, unscrew can drink, the bottle PET bottles instead of glass using single high resistance, which requires the beverage filling machine to speed up research and development, so as to adapt to the demand of the market.